Mimar Sinan Fine Arts University Institutional Repository
DSpace@MSGSÜ digitally stores academic resources such as books, articles, dissertations, bulletins, reports, research data published directly or indirectly by Mimar Sinan Fine Arts University in international standarts, helps track the academic performance of the university, provides long term preservation for resources and makes publications available to Open Access in accordance with their copyright to increase the effect of publications.Search MSGSÜ
Risk assessment in construction cost estimation of a motorway project
| dc.contributor.author | Kumas, Giray | |
| dc.contributor.author | Ergonul, S. | |
| dc.date.accessioned | 2025-01-09T20:03:38Z | |
| dc.date.available | 2025-01-09T20:03:38Z | |
| dc.date.issued | 2007 | |
| dc.identifier.isbn | 978-041546059-0 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.14124/7649 | |
| dc.description | 25th Inaugural Construction Management and Economics: 'Past, Present and Future' Conference, CME 2007 -- 16 July 2007 through 18 July 2007 -- Reading -- 96884 | en_US |
| dc.description.abstract | Construction projects face substantial and unique risk factors at every stage. These factors threaten the project targets unless the uncertainty is moved away from the project. Risk management is one of the most effective systems in order to optimize performance and minimize the risks involved in a project. This process has to be realized and considered in every stage of a project. This study presents potential risks that cause an increase in the total construction cost and analyses how construction risks are assessed in a motorway project. Construction risks are considered from the contractor's point of view. First, real forecasts of the motorway project provided by the contractor are analysed in order to define contractor's risk policy. Then, the existing risks are assessed by a probabilistic, Monte Carlo simulation method using crystal ball software. The results of the simulation method are compared with the results of the actual situation. The results show that simulation method helps the contractors to manage the costs with high risk. | en_US |
| dc.language.iso | eng | en_US |
| dc.relation.ispartof | CME 2007 Conference - Construction Management and Economics: 'Past, Present and Future' | en_US |
| dc.rights | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | en_US |
| dc.subject | Cost | en_US |
| dc.subject | Estimating | en_US |
| dc.subject | Risk | en_US |
| dc.subject | Simulation | en_US |
| dc.title | Risk assessment in construction cost estimation of a motorway project | en_US |
| dc.type | conferenceObject | en_US |
| dc.department | Mimar Sinan Güzel Sanatlar Üniversitesi | en_US |
| dc.identifier.startpage | 1637 | en_US |
| dc.identifier.endpage | 1644 | en_US |
| dc.relation.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | en_US |
| dc.identifier.scopus | 2-s2.0-84877590275 | en_US |
| dc.identifier.scopusquality | N/A | |
| dc.indekslendigikaynak | Scopus | |
| dc.snmz | KA_20250105 |
Files in this item
| Files | Size | Format | View |
|---|---|---|---|
|
There are no files associated with this item. |
|||
This item appears in the following Collection(s)
-
Տcopus [1664]
Scopus | Abstract and citation database














